34 Peckham Avenue Chatswood NSW 2067
Two (2) standalone architect designed tri-level residence
To deliver LCB managed services, HERM Group took a consultative and collaborative approach to understanding ‘Architect side + Builders side’ key requirements in delivering savings of up to 30% through strategic and tactical sourcing, fabrication and on-time delivery.In addition, we trained the ‘plastering contractor’ to erect the frames, including how to perform quality control and assurance (QC/QA)… thus eliminating ‘common problems with incorrect framing/alignment; associated cost; and time-line blowouts’
HERM Logic together with HERM Built offered a full steel framing solution with a team of specialist structural steel fabricators to ensure fabrication and building is constructed to the high standard set out within the BCA (Building Codes Australia) and AS/NZ Standards.
» 4600/2005: Cold-formed steel structures
» 4100: Steel structures
» 3623: Domestic Metal Framing [Industry Standard: >0.75mm]; and
» 1397/2001: Steel Sheet & Strip-Hot-dip Zinc Coating – comprising of,
• G550 Grade Steel with Guaranteed minimum yield strength >550MPa
• AZ150 Aluminium Zinc coating @ 150/M2
» We use >0.95mm (not 0.75mm) Steel Sheet to produce our SmartFrames – Wall, Joists, Roof.
• Construction Board: Wall & Floor. XPS form boards coated with fiberglass mesh and polymer cement mortar on both sides… providing a quick and effective solution for sound insulation between floors, including external and internal walls of main rooms (living, entertainment [AV], etc.)
» Low weight
» High compressive strength (about 350Kpa)
» Waterproof
» Excellent heat and sound insulation
» Easy to cut
» CFC free, environment friendly
• Floor & Wall Tiles: internal floor and walls; and external floor and walls – in marble, slate and granite